Recent Projects

 

JOB: Middle Street
CLIENT: KD Contractors
DESCRIPTION: 124 Bed student accommodation close to the University of Portsmouth.
   
JOB: ST James Street
CLIENT: PMC Construction
DESCRIPTION: 35 bed student accommodation close to the University of Portsmouth featuring LED lighting and energy efficient electric panel heaters.
   
JOB: Copnor Green Housing Development
CLIENT: PMC Construction
DESCRIPTION: Mixed housing development in Portsmouth for a local housing association designed to stringent energy-efficient criteria, incorporating photovoltaic solar panels, heat recovery ventilation systems, zone controlled electric heating and energy monitoring equipment.
   
JOB: Halberry Lodge – Isle of Wight
CLIENT: D M Habens
DESCRIPTION: A facility that aims to combine information, education, social and therapeutic activity for those suffering from or affected by life-limiting illness. The installation consisted of the following mains distribution including sub-mains, general power and supplies to air conditioning units etc. An addressable fire alarm and nurse call system. Control of the lighting is via a Lutron dimmable control panel with local dimmer control panels providing lighting levels to suit the requirements of the hospice.
   
JOB: Whitegates
CLIENT: Nolan Davis
DESCRIPTION: A new care home facility in Liss. This was a complete electrical installation including an addressable fire alarm system, CAT 6 network system, Telecare Assist and lightning protection.